INSTALLATION OF AUXILARY WATER SUPPLY NETWORK FOR DEPARTMENTAL LAWN – Complete Project Material


ABSTRACT

This project was aimed at providing an Auxilary water supply in the Department of Agricultural and Bio-Environmental Engineering. A reconuaissance survey was carried out to determine the route of the pipeline of which white diamond pipe 1 inch with length of 5.5 meter was used. The procedure for the installation are excavation of trench, laying of pipes and mounting of overhead tank. The installation was carried out with the use of a digger and shovel. The pipes were laid along with some fitting to cling the pipes to the centrifugal pump. While the supply pipe from the water sources was connected to the inlet of the centifrigal pump. Testing was carried out to check if there was any leakage. It was well comfirm that no any leakage along the auxiliary water supply and the pump was connected. The total amount spend was N73.920.   

TABLE OF CONTENTS

Title Page    –        –        –        –        –        –        –        ­-        –        –        i

Declaration –        –        –        –        –        –        –        ­-        –        –        ii

Approval Page-     –        –        –        –        –        –        ­-        –        –        iii

Dedication- –        –        –        –        –        –        ­-        –        –        –        iv

Acknowledgement –        –        –        –        –        –        –        ­-        –        v

Abstract –    –        –        –        –        –        –        ­-        –        –        –        vi

Table of Contents –        –        –        –        –        –        –        –        –        vii

CHAPTER ONE

1.0             Introduction-         –        –        –        –        –        –        –        ­-        1

1.2     Statement of Problem     –        –        –        –        –        –        ­-        1

1.3     Aim   –        –        –        –        –        –        ­-        –        –        –        2

1.4     Objectives   –        –        –        –        –        –        ­-        –        –        2

1.5     Significant of the Study  –        –        –        –        –        –        ­-        3

1.6     Scope of the Study –        –        –        –        –        –        ­-        –        3

CHAPTER TWO

2.0     Literature Review –        –        –        –        –        ­-        –        –        4

2.1     Quality of Ground Water –        –        –        –        –        –        ­-        5

2.2     Purification of Ground Water by Soil- –        –        –        –        –        6

2.3     Exploitation of Groundwater-   –        –        –        –        –        ­-        7

2.4     Stages in Water Borehole Drilling Process    –        –        –        –        7

2.5     Borehole Drilling Method-       –        –        –        –        –        ­-        11

2.6     Borehole Drilling and Installation-     –        –        –        –        –        12

2.7     Borehole Design and Instalation-        –        –        –        –        –        13

2.8      Types of Pump     –        –        –        –        –        –        ­-        –        13

2.9             Pipe Selection-      –        –        –        –        –        ­-        –        –        14

2.10   Types of Pipes-     –        –        –        –        –        ­-        –        –        15

2.11   The Importance of Borehole-    –        –        –        –        –        ­-        16

CHAPTER THREE

3.0     Method and Materials-    –        –        –        –        –        ­-        –        17

3.1     Excarvation of Trench    –        –        –        –        –        –        ­-       


Purchase Detail

Hello, we’re glad you stopped by, you can download the complete project materials to this project with Abstract, Chapters 1 – 5, References and Appendix (Questionaire, Charts, etc) for N5000 ($15) only,
Please call 08111770269 or +2348059541956 to place an order or use the whatsapp button below to chat us up.
Bank details are stated below.
Bank: UBA
Account No: 1021412898
Account Name: Starnet Innovations Limited

The Blazingprojects Mobile App



Download and install the Blazingprojects Mobile App from Google Play to enjoy over 50,000 project topics and materials from 73 departments, completely offline (no internet needed) with the project topics updated Monthly, click here to install.

0/5 (0 Reviews)
Read Previous

CHALLENGES IN ADMINISTERING THE CROSS RIVER STATE MINISTRY OF AGRICULTURE, NIGERIA – Complete Project Material

Read Next

ANALYSIS OF MARKETING EFFICIENCY OF FISH PRODUCTION IN LAGOS STATE – Complete Project Material

Translate »