Design and implementation of a Task Allocation System for Projects – Complete project material



Table of Contents:

Chapter 1: Introduction
1.1 Background of the Study
1.2 Statement of the Problem
1.3 Objectives of the Study
1.4 Research Questions
1.5 Scope of the Study
1.6 Significance of the Study
1.7 Limitations of the Study

Chapter 2: Literature Review
2.1 Overview of Task Allocation Systems
2.2 Existing Task Allocation Systems
2.3 Challenges in Project Task Allocation
2.4 Strategies for Effective Task Allocation
2.5 Theoretical Framework

Chapter 3: System Design
3.1 System Requirements
3.2 System Architecture
3.3 System Features
3.4 Database Design
3.5 User Interface Design

Chapter 4: Implementation
4.1 Development Tools and Technologies
4.2 Implementation Process
4.3 Testing and Evaluation
4.4 Performance Analysis
4.5 System Deployment

Chapter 5: Conclusion and Summary
5.1 Summary of Findings
5.2 Contributions of the Study
5.3 Recommendations for Future Research
5.4 Conclusion

Project Summary:

The final year project titled “Design and Implementation of a Task Allocation System for Projects” aims to address the inefficiencies and challenges in project task allocation faced by organizations. The study focuses on developing a software system that can effectively allocate tasks to project team members based on their skills, availability, and workload.

The project begins with an introduction that provides background information on the problem statement, objectives of the study, research questions, scope, significance, and limitations of the study. A thorough literature review discusses existing task allocation systems, challenges in project task allocation, and strategies for effective task allocation. The theoretical framework provides the basis for the system design.

The system design chapter outlines the system requirements, architecture, features, database design, and user interface design. The implementation chapter details the development tools and technologies used, the implementation process, testing and evaluation, performance analysis, and system deployment.

The final chapter concludes the study, summarizing the findings, contributions, recommendations for future research, and the overall conclusion. The project aims to provide a valuable solution for organizations to efficiently allocate tasks in project management, ultimately improving productivity and project success.


Purchase Detail

Download the complete project materials to this project with Abstract, Chapters 1 – 5, References and Appendix (Questionaire, Charts, etc), Click Here , to place an order via whatsapp. Got question or enquiry; Click here to chat us up via Whatsapp.
You can also call 08111770269 or +2348059541956 to place an order or use the whatsapp button below to chat us up.
Bank details are stated below.

Bank: UBA
Account No: 1021412898
Account Name: Starnet Innovations Limited

The Blazingprojects Mobile App



Download and install the Blazingprojects Mobile App from Google Play to enjoy over 50,000 project topics and materials from 73 departments, completely offline (no internet needed) with monthly update to topics, click here to install.

0/5 (0 Reviews)
Read Previous

Analyzing the environmental benefits of natural disaster management strategies – Complete project material

Read Next

Endocrine System Disorders and Their Effects on Physiology – Complete project material with references

Leave a Reply

Your email address will not be published. Required fields are marked *

Translate »