CONSTRUCTION OF BOREHOLE IN AGRICULTURAL AND BIO-ENVIRONMENTAL ENGINEERING DEPARTMENT – Complete Project Material


TABLE OF CONTENT

Title page    —       –        –        –        –        –        –        –        –        –        – i     

Declaration —        –        –        –        –        –        –        –        –        –        -ii

Approval page —   –        –        –        –        –        –        –        –        –        -iii

Dedication —         –        –        –        –        –        –        –        –        –        -iv

Acknowledgement —       –        –        –        –        –        –        –        –        -v     

Table of content   —         –        –        –        –        –        –        –        –        -vi                 Abstract —   –        –        –        –        –        –        –        –        –        –        -vii

CHAPTER ONE

1.0     Background of Study      –        –        –        –        –        –        –        -1

1.1     Preamble  –           –        –        –        –        –        –        –        –        -1

1.2     Statement of the Problem –        –        –        –        –        –        –        -2     

1.3     Aim and Objective of the Study  –       –        –        –        –        –        -3

1.4     Significance of the Study   –      –        –        –        –        –        –        -3

1.5     Scope of the Study –        –        –        –        –        –        –        –        -4     

CHAPTER TWO

2.0     Literature Review —        –        –        –        –        –        –        –        -5     

2.1     Borehole construction –   –        –        –        –        –        –        –        -5     

2.2     Ground Water Occurrence –      –        –        –        –        –        –        -6                  

2.3     Borehole Siting  –            –        –        –        –        –        –        –        -7     

2.4     Methods of Drilling –      –        –        –        –        –        –        –        -9     

2.5     Factors Affecting Borehole Performance      –        –        –        –        -12

2.6     Borehole Development – –        –        –        –        –        –        –        -13

2.7     Borehole Design – –        –        –        –        –        –        –        –        -15

CHAPTER THREE

3.0     Materials and Method —  –        –        –        –        –        –        –        -20   

3.1     Site Location –      –       –        –        –        –        –        –        –        -20   

3.2     Location –    –        –        –        –        –        –        –        –        –        -20

3.3     Climate –     –       –        –        –        –        –        –        –        –        -20

3.4     Reconnaissance Survey on the Project Area –        –        –        –        -21

3.5     Procedure for Geophysical Survey      –        –        –        –        –        -22

3.6     Accessories used for Geophysical Investigation –    -&n


Get Complete Project Now »

Talk to us right now: (+234)906-451-7926 (Call/WhatsApp)


Share a Comment


Purchase Detail

Hello, we’re glad you stopped by, you can download the complete project materials to this project with Abstract, Chapters 1 – 5, References and Appendix (Questionaire, Charts, etc) for N5000 ($15) only,
Please call 08111770269 or +2348059541956 to place an order or use the whatsapp button below to chat us up.
Bank details are stated below.
Bank: UBA
Account No: 1021412898
Account Name: Starnet Innovations Limited

The Blazingprojects Mobile App



Download and install the Blazingprojects Mobile App from Google Play to enjoy over 50,000 project topics and materials from 73 departments, completely offline (no internet needed) with the project topics updated Monthly, click here to install.

0/5 (0 Reviews)
Read Previous

AVAILABILITY AND USE OF SWAMP RICE PRODUCTION TECHNOLOGIES AMONG FARMERS IN ENUGU STATE NIGERIA. – Complete Project Material

Read Next

ECONOMIC OF CASSAVA PROCESSING IN IBESIKPO ASUTAN L.G.A AKS – Complete Project Material

Translate »